RFS Dmitry Donskoy TK-208 (three)
Saturday, March 24, 2012RFS Dmitry Donskoy TK-208 Russian Submarine 3 |
image dimensions : 1200 x 800 |
RFS Dmitry Donskoy TK-208 (three) RFS Dmitry Donskoy, submarine, ship, Navy, Russian, Sovyet Union, Project 941, TK-208 Akula, Typhoon, nuclear missiles launcher, military, Rubin Design Bureau, ocean, voyage, widescreen, wallpaper, photo, picture.
RFS Dmitry Donskoy TK-208 (Wallpaper 3) is Project 941 Akula heavy nuclear-powered ballistic missile submarine, lead ship of the project. REGISTRATION. Zapadnaya Litsa, Northern Fleet. CONSTRUCTION, NAME. The sub was laid down on June 30, 1976 at Sevmashpredpriyatie Shipyard and commissioned in 1981. She joined Northern Fleet in 1982. The submarine is known as Dmitry Donskoy since October 7, 2002. MILESTONES. In 1987 the sub entered Navy's Roll of Honor; in 1989 - Honors Board of Ministry of Defense. In 1989 she was inactivated and laid up at Sevmash for general modernization under Project 941U. In 1991 the work was shut down. Modernization under Project 941UM was pushed in 1996. On July 26, 2002 the sub was commissioned into Northern Fleet again. RFS Dmitry Donskoy TK-208 (Wallpaper 3). In 2008 she passed repair and upgrade at Sevmash shipyard. In 2009 it is expected to complete test launches of SLBM Bulava based on the submarine. PERFORMANCE. NATO classification: SSBN Typhoon. Surface speed: 12 knots. Submerged speed: 27 knots. Operating depth: 400 meters. Endurance: 180 days. Crew: 160 men. DIMENSIONS Surface displacement: 23,200 (28,500) tons. Submerged displacement: 48,000 (49,800) tons. Extreme length (at design waterline): 172 meters. Extreme beam: 23.3 meters. Mean draft (at design waterline): 11 meters. PROPULSION. Nuclear reactor; 2 water-cooled reactors OK-650; 50,000 shp each (36.7 mW). 2 screw shafts. 4 steam-turbine nuclear power plants; 3.2 mW each. Reserve: 2 diesel generators DG-750 (kW). Lead-acid storage battery. ARMAMENT. 6 x 533-mm torpedo tubes. 22 torpedoes 53-65K, SET-65, SAET-60M, USET-80 and Vodopad rocket torpedoes 20 SLBM Bulava. 8 Igla MANPADS launchers. RFS Dmitry Donskoy TK-208 (Wallpaper 3).
RFS Dmitry Donskoy TK-208 (Wallpaper 3) is Project 941 Akula heavy nuclear-powered ballistic missile submarine, lead ship of the project. REGISTRATION. Zapadnaya Litsa, Northern Fleet. CONSTRUCTION, NAME. The sub was laid down on June 30, 1976 at Sevmashpredpriyatie Shipyard and commissioned in 1981. She joined Northern Fleet in 1982. The submarine is known as Dmitry Donskoy since October 7, 2002. MILESTONES. In 1987 the sub entered Navy's Roll of Honor; in 1989 - Honors Board of Ministry of Defense. In 1989 she was inactivated and laid up at Sevmash for general modernization under Project 941U. In 1991 the work was shut down. Modernization under Project 941UM was pushed in 1996. On July 26, 2002 the sub was commissioned into Northern Fleet again. RFS Dmitry Donskoy TK-208 (Wallpaper 3). In 2008 she passed repair and upgrade at Sevmash shipyard. In 2009 it is expected to complete test launches of SLBM Bulava based on the submarine. PERFORMANCE. NATO classification: SSBN Typhoon. Surface speed: 12 knots. Submerged speed: 27 knots. Operating depth: 400 meters. Endurance: 180 days. Crew: 160 men. DIMENSIONS Surface displacement: 23,200 (28,500) tons. Submerged displacement: 48,000 (49,800) tons. Extreme length (at design waterline): 172 meters. Extreme beam: 23.3 meters. Mean draft (at design waterline): 11 meters. PROPULSION. Nuclear reactor; 2 water-cooled reactors OK-650; 50,000 shp each (36.7 mW). 2 screw shafts. 4 steam-turbine nuclear power plants; 3.2 mW each. Reserve: 2 diesel generators DG-750 (kW). Lead-acid storage battery. ARMAMENT. 6 x 533-mm torpedo tubes. 22 torpedoes 53-65K, SET-65, SAET-60M, USET-80 and Vodopad rocket torpedoes 20 SLBM Bulava. 8 Igla MANPADS launchers. RFS Dmitry Donskoy TK-208 (Wallpaper 3).
- RFS Dmitry Donskoy TK-208 (Wallpaper 1)
- RFS Dmitry Donskoy TK-208 (Wallpaper 2)
- RFS Dmitry Donskoy TK-208 (Wallpaper 4)
Labels: RFS Dmitry Donskoy
|
<< Home